PAGE 7
Evaporator Rooms.
At 1350 a report was made to the M.C.R. that the Evaporator Rooms (particularly the Port) were becoming untenable due to heavy black smoke and fumes. The order was given to shut all ventilation valves to these rooms which resulted in the smoke gradually clearing but temperatures rose rapidly. Portable fans were rigged and the standby watchkeepers sent for to take 15 minute spells. The watch-keeper at the port evaporator was overcome before he could be relieved and was brought up by a Leading Stoker. Another Warrant Engineer then reported to the M.C.R. that the port evaporator room must be closed down but the Senior Engineer insisted that both plants must be kept going as so much feed water was being lost. A Leading Stoker there-fore, took over the watch at the top of the hatch and made frequent visits to the evaporator to see that it was running correctly. By these means both sets of evaporators continued to run until the ship reached harbour.
Dynamo Rooms
After the ship was hit it was reported to the M.C.R, that Nos. 2, 3, and 4 dynamo rooms were full of dense smoke. The watchkeepers successfully dealt with this in the following ways- No.2 watchkeeper obtained a breathing apparatus and carried on with his work, No. 3 watchkeeper opened the small access hatch and the fumes gradually cleared, No. 4 watchkeeper was forced to leave the room, tripping the machine before leaving. Aided by the dynamo E.R.A. the conditions were improved and the machine restarted and on load by 1404. Various other difficulties were encountered and overcome, and the dynamos continued to run through the coolness and efficiency of the watchkeepers aided by the initiative and resource of the dynamo E.R.A.
Electrical_Report.
State of Readiness
All six dynamos wert running and the ring main was divided into six sections by opening all ring main breakers.
Action electrical 'repair parties were closed up and reported correct at 1215. They were stationed as follows:
No. 1 - Electrical R.U. Store, upper deck, 56 station
No, 2 - Outside main switchboard, main deck, 70 station.
No. 3 - Machine shop starboard, main deck, 100 station,
No. 4 - Low power work shop, main deck, 118 station.
No 5 - Cabin flat, main deck, 137 station.
No 6 - Flying control room.
These parties were each equipped with a repair box, 500 and 100 watt portable lanterns or reflectors, illuminating circuits, and spare lengths of cable patt. 1889, 1888, 546 and 991.
Summary of Electria1 Damage Sustained During Dive Bombing Attacks, at 1240 and 1610.
The first hit went through P.2 Porn-porn platform and outboard; it did not cause any electrical damage.
The second hit went through flight deck port side forward and passing through the lecture room burst outboard. Splinters caused much damage to lighting and power leads in the adjacent compartments. P.1 searchlight power supply and control leads were cut and the resistances on the cable deck wrecked; the mounting and lamp itself were un-damaged. Other splinters from this bomb severed "W” and "F" D.G. cables.
|
|